Virginia DOT Resilience Plan | Plan
Resilience, System PerformanceVirginia DOT has developed a Resilience Plan to formalize a framework for incorporating resilience into transportation planning, project development, delivery, operations, maintenance and asset management. The Plan offers specific strategies built upon broad, goal-based objectives that will support appropriate and scientifically-based options for decision-makers. VDOT is currently working with FHWA to identify potential gaps between the VDOT Resilience Plan and the Resilience Improvement Plan requirements.
Publisher: Virginia Department of Transportation
TPM Newsletter - Fall 2022 | Marketing/Communications
Accessibility, Mobility, Resilience, System PerformanceThe Fall 2022 issue is focused on emerging performance areas, and features the following articles and content:
- Welcome from the AASHTO CPBM Chair
- Next Generation of Performance Management: New Task Force on Emerging Performance Areas
- MassDOT Destination Accessibility Measurement and Application
- Advancing Transportation Equity in Minnesota
- AASHTO Updates
- Writing a 'Good' Risk Statement
- Featured Transportation Research
- Save the Date
- Get Involved in a CPBM Subcommittee or Work Group
Publisher: AASHTO, CPBM, The Transportation Pooled Fund
Attracting, Retaining, and Developing the 2030 Transportation Workforce: Design, Construction, and Maintenance | Guide/Manual
Organizational ManagementDistrict of Columbia DOT TAMP 2022 | Plan
Asset Management, Bridge, PavementThis 2022 Transportation Asset Management Plan (TAMP) provides updates to the Transportation Asset Management Plan certified by the Federal Highway Administration (FHWA) in August 2019. This 2022 TAMP includes NHS pavements and bridges, DDOT‐maintained non‐NHS pavements (i.e., local roads and federal‐aid roads), non‐NHS bridges (including pedestrian bridges), tunnels, alleys, and sidewalks. While DDOT has attempted to develop a comprehensive TAMP including other assets, the analysis in this TAMP has been limited to assets which have sufficient data and information. As such, additional assets beyond the NHS pavement and bridges are not to be considered part of the TAMP recertification process.
Connecticut DOT TAMP 2022 | Plan
Asset Management, Bridge, PavementCTDOT's 2022 Highway Transportation Asset Management Plan goes beyond federal requirements by including nine assets in addition to NHS pavements and bridges as well as major transit. Four of these assets are newly reported on since the 2019 TAMP.
Publisher: Connecticut Department of Transportation
AASHTO CPBM TAM Subcommittee – TAM Strategic Action Plan | Flyer/Handout, Plan
Asset Management, Bridge, PavementThis TAM Strategic Action Plan establishes a common agenda for advancing TAM knowledge and practice for the American Association of Transportation Officials (AASHTO) Committee on Performance- Based Management (CPBM) Subcommittee on Asset Management, in coordination with the Subcommittee’s partners and stakeholders.
A 2019 TAM Strategic Planning Workshop, held on October 17-18, 2019 in Irvine, California, provided the foundation for the AASHTO CPBM TAM Subcommittee – TAM Strategic Action Plan. With over 45 attendees representing more than 35 organizations, the discussions brought together many voices and perspectives to identify, define, and prioritize the specific opportunities for TAM advancements that will deliver real value to transportation agencies.
A full research report is available at: https://onlinepubs.trb.org/Onlinepubs/nchrp/docs/NCHRP20-123-01FinalReport.pdf.
Alaska Moves 2050 Public Review Draft | Plan
This plan is the tentative version of Alaska's upcoming Long Range Plan, released for public comment before the finalized plan is released. This plan embodies the long-range vision, policies and objectives that will guide Alaska’s transportation development for the next 20-year period. When Alaska Moves 2050 is completed in the fall of 2022, it will supersede the previous plan Let's Keep Moving 2036.
TPM Webinar 13 - GHG & Environmental Measures | Guide/Manual, Research Report, Webinar/Video
Emissions, Environment-
TPM Webinar 13 - Greenhouse Gas & Environmental Measures | VideoWebinar/Video
Minnesota DOT TAMP 2022 | Plan
Asset Management, Bridge, PavementMnDOT initiated a strategic planning process for asset management after completing the 2019 TAMP. The final plan, called the Asset Management Strategic Implementation Plan, provides direction for improving the management of highway assets over the next five years. It sets a vision for asset management at MnDOT and establishes near-term objectives. The TAMP planning process uses the AMSIP vision and objectives. MnDOT is recognized nationally as a leader in asset management.
Publisher: Minnesota Department of Transportation
GHG NPRM Comment Template | DocumentTemplate
Emissions, Environment, System PerformanceOn July 7, 2022 FHWA announced a Notice of Proposed Rulemaking (NPRM) for states and municipalities to track and reduce greenhouse gas (GHG) emissions. This document provides a template for commenting on the NPRM.
Download
Multi-State Letter of Support – GHG NPRM | Marketing/Communications
Emissions, EnvironmentA letter expressing support and encouragement for the GHG performance standard signed by state transportation agency executives from California, Colorado, Connecticut, Hawaii, Illinois, Minnesota, Oregon, Pennsylvania, Washington State, Vermont, and the District of Columbia.
2022 GHG NPRM Schedule | DocumentFlyer/Handout
Emissions, Environment, System PerformanceOn July 7, 2022 FHWA announced a Notice of Proposed Rulemaking (NPRM) for states and municipalities to track and reduce greenhouse gas (GHG) emissions. This document presents a schedule for the 90-day commenting period for the NPRM.
Download